Construction documents
Construction documents phase
The drawings and specifications a contractor prices and builds from — usually the heaviest phase. Keep the current set current, and log hours against CD as you go.
Read moreProjects in Arcarrow are structured the way you already work — schematic design through construction administration — with time, budgets, and invoices organized around the phases, not bolted onto them.
SD through CA, built in.
The five phases
The AIA's standard owner-architect agreement breaks architectural services into five phases that run from the first sketch to the finished building.
| Phase | What happens | When | Typical fee share |
|---|---|---|---|
SDSchematic Design | The big moves: site plan, massing, floor plans, and a first read on scope and budget. | First design phase | ~15% |
DDDesign Development | The approved concept firms up — materials, systems, structure, and dimensions get locked. | After the schematic is approved | ~20% |
CDConstruction Documents | The drawings and specifications a contractor prices and builds from — the heaviest phase. | After design is locked | ~40% |
B/NBidding & Negotiation | Helping the owner solicit bids, evaluate them, and land a contract with a builder. | After documents are issued | ~5% |
CAConstruction Administration | Site visits, RFIs, and submittals — confirming the built work matches the documents. | During construction | ~20% |
Smaller firms often fold bidding into construction administration — which is why Arcarrow projects start on SD, DD, CD, and CA, and your firm can rename or extend the sequence to match how you run jobs.
The other name
You'll also hear AIA phases called AIA work stages. The AIA's standard owner-architect agreement names them phases, not stages — but it's the same sequence from the first sketch to the finished building: schematic design, design development, construction documents, bidding and negotiation, and construction administration.
If you searched for AIA work stages, this is that sequence. Arcarrow projects start on it, so time, budgets, and invoices speak the same language as the contract.
The heaviest phase
After design development locks the major decisions, the construction documents phase is when you produce the drawings and specifications a contractor prices and builds from. It's typically about 40% of the design fee — the largest share, and the phase that eats the most hours.
Arcarrow keeps the current CD set in one place and logs hours against the phase, so the invoice can say Construction Documents the way the contract does. Construction documents phase: what CD includes, and how the current set and the hours stay together.
The problem
Generic project tools make you fake your profession's structure. Design Development becomes a label. Construction Documents becomes a column. You spend setup time teaching the tool what a phase is — and maintenance time keeping the metaphor from falling apart.
And because the phases are just decoration, nothing downstream understands them. Hours don't roll up by phase. The invoice can't say what the client expects it to say. Every report needs hand-assembly.
Arcarrow starts from the phase structure architects actually use, and hangs the rest of the project on it.
How it works
Every new project starts on your firm's phase sequence — Schematic Design, Design Development, Construction Documents, Construction Administration — with no setup. Your firm can rename, reorder, or extend the list to match how you actually run jobs.
Hours land on the phase they belong to, and the budget rollup breaks actuals down phase by phase — so you can see DD running hot before it becomes CD's problem.
Invoices group labor by phase, so your client reads the same SD-through-CA structure your contract is written in — not a flat list of hours.
The timeline, the hours, and the budget all read in the same phases.
Skip the setup ritual — start every project on the structure your profession already agreed on.
Glossary
The five-phase sequence used across US architectural practice — and the structure every Arcarrow project starts on.
Keep exploring
Construction documents
The drawings and specifications a contractor prices and builds from — usually the heaviest phase. Keep the current set current, and log hours against CD as you go.
Read moreTime & billing
Log time against phases and turn it into a professional invoice, backed by a project record that supports every line on it.
Read more