Projects are structured the way you already work — schematic design through construction administration, with time, documents, and milestones organized by phase.
Read moreConstruction documents are the drawings and specs a contractor prices and builds from. Arcarrow keeps the current set in one place and logs hours against CD, so the invoice matches the phase that's eating the week.
Current set and CD hours, together.
What CD is
The construction documents phase sits after design development, once materials, systems, and dimensions are locked. You produce the architectural drawings and specifications — coordinated with structure, MEP, and the other consultants — that a contractor uses to price the job and build it.
It's typically about 40% of the design fee, the largest share of the five core AIA phases. Smaller firms still run CD even when they fold bidding into construction administration. Arcarrow projects start on SD, DD, CD, and CA for that reason.
The problem
Design development locked the major moves. Now you're producing the drawings and specifications a contractor will price and build from — floor plans, elevations, details, schedules, and the spec book that has to agree with them. This is usually about 40% of the design fee, and it's the phase that eats the most hours.
The week goes two ways at once. You're issuing the next CD revision while logging time against Construction Documents so the invoice can say what the contract says. When the current set lives in email and the hours live in a spreadsheet, both of those jobs fall apart.
Arcarrow hangs both on the same phase: one current CD set your client and contractor can trust, and hours that roll up as Construction Documents — not as a pile of unlabeled timesheet rows.
How it works
Every project starts on schematic design through construction administration. Construction Documents is a phase with a budget and a timeline — not a folder name you invent when it's time to issue drawings.
Issue the next CD revision and it becomes the set your client and contractor see. Superseded revisions are marked and out of reach, so nobody prices or builds from last month's drawings.
The hours that belong to Construction Documents land on that phase, and the invoice groups labor the same way. You can see CD running hot before closeout, and the client reads the phase their contract already names.
The issued CD revision everyone is looking at, with hours logged against Construction Documents.
Keep the current CD set where the hours already are, and let the invoice speak the same language as the contract.
Keep exploring
Project structure
Projects are structured the way you already work — schematic design through construction administration, with time, documents, and milestones organized by phase.
Read moreDrawing revisions
Your client and your contractor always see the latest issued drawings, superseded revisions are marked and out of reach, and nobody has to ask which version is current.
Read more